Skip to content
Amman —

Ministry of Public Works to Begin Maintenance on Part of Al-Sixty Street in Al-Salt Tomorrow Evening

Ministry of Public Works to Begin Maintenance on Part of Al-Sixty Street in Al-Salt Tomorrow Evening

The Ministry of Public Works and Housing will begin, tomorrow evening, Saturday, implementing maintenance works for a section of Al-Sixty Street in the city of Al-Salt, extending from Al-Sixty Bridge towards Al-Shajarah Tunnel, as part of the comprehensive tender for maintaining a number of main and vital roads in the Central Region.

The Ministry stated that the works include milling and removing damaged asphalt layers, and repaving them with polymer-modified asphalt mixtures, alongside implementing traffic safety requirements, including road markings and installing road studs, in accordance with approved technical specifications and standards.

It explained that the maintenance of this section of Al-Sixty Street comes within its plan to raise the efficiency of the road network, sustain infrastructure, and improve the level of traffic safety, through an integrated program for the maintenance and rehabilitation of a number of main roads in the Central Region, contributing to improving the level of service and providing safer roads for users.

The Ministry indicated that the works will be carried out in coordination and cooperation with the Public Security Directorate, and in accordance with a temporary traffic plan that takes into account maintaining smooth traffic flow and minimizing the impact of the works on vehicle movement as much as possible, while taking all necessary safety measures to protect road users and workers at the project site throughout the implementation period.

The Ministry urged users of Al-Sixty Street to exercise caution while passing through the work zone, adhere to traffic and warning signs and instructions issued by the Ministry's cadres and the Public Security Directorate, and abide by safe driving rules, in order to ensure their safety and the safety of workers and to guarantee the completion of works within the specified timeframe.

Know more about this story?Send us a tip

Al Rai

AI

Ask about this report — answers stay grounded in its text.

Answers are experimental and grounded in Al Rai reporting. Each question uses 2 credits.