Skip to content
Amman —

Greater Tafilah Municipality Begins Paving 250,000 Square Meters of Its Roads at a Cost of 1.6 Million Dinars

Greater Tafilah Municipality Begins Paving 250,000 Square Meters of Its Roads at a Cost of 1.6 Million Dinars

The Greater Tafilah Municipality has started implementing the road paving project with hot asphalt mix on a total area of up to 250,000 square meters, covering major vital areas within the province, at a total cost of 1.650 million dinars.

Dr. Muhammad Al-Kreimiyin, Chairman of the Greater Tafilah Municipality Committee, confirmed in a statement to (Al-Rai) that the responsible contractor has actually started implementing the hot asphalt mix tender in the areas of Al-Ais, the city center, Al-Hussein neighborhood, Aima, and Al-Ain Al-Bayda, noting that the maximum time period for project completion is about one and a half months, with the highest degree of field readiness to ensure rapid implementation according to the highest technical specifications and quality standards.

Al-Kreimiyin explained that the launch of the project translates the municipality's strategic vision to develop infrastructure and provide a safe and qualified road network that serves population bases and urban agglomerations in the districts and areas affiliated with the municipality.

Al-Kreimiyin added that the tenders that have been started also include the construction and development of rainwater drainage networks, pipe and box culverts, and stone support chains, with a financial allocation of 500,000 dinars, to ensure the continuity and enhancement of asphalt work and protect roads from erosion and water accumulation during the rainy season, especially in areas with mountainous terrain and steep slopes.

He pointed out that the start of distributing hot mixes and hot mixes came based on a comprehensive field survey and engineering studies that determined the most urgent service priorities; where the most densely populated and needy areas in Al-Ais, the city, Al-Hussein neighborhood, Aima, and Al-Ain Al-Bayda were covered, to alleviate the suffering of citizens and drivers, and to facilitate transportation and daily service experiences.

Al-Kreimiyin emphasized that the engineering and regulatory and field staff of the Greater Tafilah Municipality are directly and daily supervising all stages of the ongoing work, to achieve the highest standards of public safety and quality, expressing his appreciation for the cooperation of the local community with the workers in the field during the period of implementation of the service works in those areas.

Know more about this story?Send us a tip

Al Rai

AI

Ask about this report — answers stay grounded in its text.

Answers are experimental and grounded in Al Rai reporting. Each question uses 2 credits.