Miyahuna Company, in cooperation with the Public Security Directorate, carried out a campaign on 26/10/2026 to detect violations on main pipelines in several areas in Zarqa, as a continuation of measures to tighten control, regulate, and protect water sources, and for the purpose of reducing water loss rates. The violations consisted of extending branch connections of various diameters and lengths from the 300mm Hallabat transmission line to supply properties not served by water and built on state treasury lands. The estimation of quantities and the preparation of reports against the violators will be completed once finalized by the competent committees to take the necessary legal actions in this regard.